Energy & decarbonization
Bioelectricity and industrial capacity (sector aggregate)
5 mills have bagasse cogeneration registered with ANEEL, totaling 101.5 MW; in 2025 they delivered 56.0 GWh to the grid.
101.5MW installed
06/10/2026 · ANEEL — SIGA (06/10/2026); CCEE — dados abertos de geração (contabilização); ANP — produtores de etanol autorizados (ago/2026).
Note
"Delivered" energy = settled at CCEE; it excludes the mills' own process consumption. Anhydrous and hydrous capacities are alternatives (not additive). The João Pessoa landfill biogas plant (5.7 MW) is not part of the sector and is excluded.
Source
ANEEL — SIGA (06/10/2026); CCEE — dados abertos de geração (contabilização); ANP — produtores de etanol autorizados (ago/2026).