Bioelectricity and industrial capacity (sector aggregate)
5 mills have bagasse cogeneration registered with ANEEL, totaling 101.5 MW; in 2025 they delivered 56.0 GWh to the grid.
101.5MW installed
06/10/2026 · ANEEL — SIGA (06/10/2026); CCEE — dados abertos de geração (contabilização); ANP — produtores de etanol autorizados (ago/2026).
5.0millsMills with registered bagasse cogeneration
101.5MWInstalled capacity (licensed)
56.0GWhEnergy delivered to the grid — 2025
50.1GWhEnergy delivered to the grid — 2024 (Mar–Dec)
3,305.0m³/dayLicensed hydrous ethanol capacity
2,470.0m³/dayLicensed anhydrous ethanol capacity
Note
"Delivered" energy = settled at CCEE; it excludes the mills' own process consumption. Anhydrous and hydrous capacities are alternatives (not additive). The João Pessoa landfill biogas plant (5.7 MW) is not part of the sector and is excluded.
Source
ANEEL — SIGA (06/10/2026); CCEE — dados abertos de geração (contabilização); ANP — produtores de etanol autorizados (ago/2026).